The building possesses a number of problems regarding the amount of light it gains and the possibility of thermal problems surrounding its nearby surfaces. One of the major issues concerning the building was the amount of heat the building was getting. It was possible that the rise of temperature was caused by the materials used to structure this architectural piece. An inferred thermometer gun was used to test the temperature of the building and found that only some areas of the building had major problems with bad insulation. This was evident when they recounted melted plastic cones found by one of the employees.
Construction of the building:
Constuction finished on spring 2003 and was later opened on the 23rd October 2003
Constuction finished on spring 2003 and was later opened on the 23rd October 2003
The Interior of the building
Frank Gehry's Sketches of the Walt Disney Concert Hall
Referencing:
http://www.musiccenter.org/about/venue_wdch.html
http://www.sbse.org/awards/docs/2005/1187.pdf
http://figure-ground.com/disney_hall/
http://kimfmdesigns.com/483e_web/project04/work01.html
http://www.nytimes.com/imagepages/2008/11/23/nyregion/23artsnj_CA0.ready.html
http://www.arcspace.com/architects/gehry/disney2/
http://www.musiccenter.org/about/venue_wdch.html
http://www.sbse.org/awards/docs/2005/1187.pdf
http://figure-ground.com/disney_hall/
http://kimfmdesigns.com/483e_web/project04/work01.html
http://www.nytimes.com/imagepages/2008/11/23/nyregion/23artsnj_CA0.ready.html
http://www.arcspace.com/architects/gehry/disney2/
No comments:
Post a Comment